DEVELOPMENT/TEST

Development

CAD ROOM CAD SIMULATION

Development project in BESTEX starts from the planning stage where we work together with our clients who are the researchers from car manufactures. In our CAD room which was installed in1989, the latest computers are operated for three-dimensional computation. We aim at efficient product development by processing three-dimensional data sent on-line from car manufacturers, transmitting three-dimensional data to our manufacturing section and repeating simulation.

Test

TESTER FF PIPE VIBRATION TEST ENGINE MOUNT FATIGUE TEST

We inspect trail products from various angles during the development stages. For example, checking metal fatigue caused by constant loads and looking for shapes which will not cause defects during mass-production. Problems are immediately reflected in drawings, examined and solved. When matured, our ideas are converted into products. We have an unlimited number of development themes to make our products as high quality, in a shorter time, and at a lower cost.

PAGE TOP